Summer Construction at SACS 2013

Friday, June 29, 2012

Finding history under the ceilings

Posted by Joan Cavallo at 8:25 AM

Last roof work underway

Posted by Joan Cavallo at 8:25 AM

Installing ventilation in ceiling

Posted by Joan Cavallo at 8:25 AM

Repairing Canopy

Posted by Joan Cavallo at 7:48 AM

Wednesday, June 27, 2012

Waiting to be installed

Posted by Joan Cavallo at 2:55 PM

Temporary power

Posted by Joan Cavallo at 2:55 PM

The Band Room

Posted by Joan Cavallo at 2:55 PM

Canopy demolition underway

Posted by Joan Cavallo at 8:36 AM

Monday, June 25, 2012

Demolition continues ...

Getting to the bare ceiling everywhere
Posted by Joan Cavallo at 10:13 AM

Friday, June 22, 2012

Staging equipment to go into the Mezz

Posted by Joan Cavallo at 12:46 PM

Demolition is underway

Unit ventilators are gone and ceilings are coming down.
Posted by Joan Cavallo at 12:44 PM

Thursday, June 21, 2012

Protecting the floor

Posted by Joan Cavallo at 12:44 PM

Wednesday, June 20, 2012

Heater gone ...

Posted by Joan Cavallo at 8:39 AM
Newer Posts Older Posts Home
Subscribe to: Comments (Atom)

Blog Archive

  • ►  2013 (22)
    • ►  August (6)
    • ►  July (8)
    • ►  June (8)
  • ▼  2012 (69)
    • ►  September (3)
    • ►  August (26)
    • ►  July (25)
    • ▼  June (15)
      • Finding history under the ceilings
      • Last roof work underway
      • Installing ventilation in ceiling
      • Repairing Canopy
      • Waiting to be installed
      • Temporary power
      • The Band Room
      • Canopy demolition underway
      • Demolition continues ...
      • Staging equipment to go into the Mezz
      • Demolition is underway
      • Protecting the floor
      • Heater gone ...
      • Taking apart hot water heater.
      • Getting ready for construction summer