Summer Construction at SACS 2013

Friday, June 28, 2013

June 28 update.









Posted by Joan Cavallo at 8:32 AM
Labels: Floors are ready. Library. Taking shape. Getting ready to pour concrete. New ceiling ready to go in.

Tuesday, June 25, 2013

June 25th





Posted by Joan Cavallo at 10:39 AM
Labels: Library getting put back together. Scraping up the tile. Cafeteria floor comes out bit by bit. K floor is ready to go.

Monday, June 24, 2013

June 24 update





Posted by Joan Cavallo at 2:27 PM
Labels: Library is taking shape. Old bleachers are gone. Taking up the floors. Starting in kindergarten. Sidewalk and garden bed demolition is started.

Thursday, June 20, 2013






Posted by Joan Cavallo at 4:46 PM
Labels: Railing removed. Barricades up. Library already going in. Cafeteria floor demolition.

Posted by Joan Cavallo at 2:01 PM
Labels: Power Washing the concrete.

Tuesday, June 18, 2013





Posted by Joan Cavallo at 10:04 AM
Labels: Getting ready for the bleachers. Demolition through out.


Demolition begins

Posted by Joan Cavallo at 8:41 AM
Labels: After one day.

Friday, June 14, 2013

Step One- the library is empty!

Posted by Anonymous at 3:38 PM
Newer Posts Older Posts Home
Subscribe to: Comments (Atom)

Blog Archive

  • ▼  2013 (22)
    • ►  August (6)
    • ►  July (8)
    • ▼  June (8)
      • June 28 update.
      • June 25th
      • June 24 update
      • No title
      • No title
      • No title
      • Demolition begins
      • Step One- the library is empty!
  • ►  2012 (69)
    • ►  September (3)
    • ►  August (26)
    • ►  July (25)
    • ►  June (15)
Simple theme. Theme images by Ollustrator. Powered by Blogger.