Summer Construction at SACS 2013

Tuesday, July 3, 2012

Ready for suspended ceiling.

Posted by Joan Cavallo at 12:03 PM
Newer Post Older Post Home

Blog Archive

  • ►  2013 (22)
    • ►  August (6)
    • ►  July (8)
    • ►  June (8)
  • ▼  2012 (69)
    • ►  September (3)
    • ►  August (26)
    • ▼  July (25)
      • Art gallery. Ceiling going in
      • Rooms in old First Grade Hallway
      • A Fresh Coat of Paint
      • Bus Entrance
      • Helene put away a time capsule.
      • Logistics Team Tour
      • Band Room is Really Taking Shape
      • The Little Gym
      • K ceiling grids are in.
      • Band room is coming along.
      • Cafe ventilation is painted.
      • Small gym ready to go - almost
      • Old first grade hallway.
      • Air in gym.
      • The Mezz
      • Higher ceilings give more light. Band ceiling give...
      • New Electrical panels. Much smaller.
      • Update meeting
      • School Board Tour
      • Air in the Cafe and Gym
      • Gym wall opening
      • Ceiling in little gym is all the way up.
      • Ready for suspended ceiling.
      • Ready for gym wall holes
      • Canopy demolition complete. Ready to rebuild.
    • ►  June (15)
Simple theme. Theme images by Ollustrator. Powered by Blogger.