Summer Construction at SACS 2013

Tuesday, July 17, 2012

Update meeting

The tour to look at progress. We are on schedule.

Canopy patches are in.

Moving pipes to get around new air handling units. We did without water for the first day of Summer School.
Posted by Joan Cavallo at 9:06 AM
Newer Post Older Post Home

Blog Archive

  • ►  2013 (22)
    • ►  August (6)
    • ►  July (8)
    • ►  June (8)
  • ▼  2012 (69)
    • ►  September (3)
    • ►  August (26)
    • ▼  July (25)
      • Art gallery. Ceiling going in
      • Rooms in old First Grade Hallway
      • A Fresh Coat of Paint
      • Bus Entrance
      • Helene put away a time capsule.
      • Logistics Team Tour
      • Band Room is Really Taking Shape
      • The Little Gym
      • K ceiling grids are in.
      • Band room is coming along.
      • Cafe ventilation is painted.
      • Small gym ready to go - almost
      • Old first grade hallway.
      • Air in gym.
      • The Mezz
      • Higher ceilings give more light. Band ceiling give...
      • New Electrical panels. Much smaller.
      • Update meeting
      • School Board Tour
      • Air in the Cafe and Gym
      • Gym wall opening
      • Ceiling in little gym is all the way up.
      • Ready for suspended ceiling.
      • Ready for gym wall holes
      • Canopy demolition complete. Ready to rebuild.
    • ►  June (15)
Simple theme. Theme images by Ollustrator. Powered by Blogger.